Celebrating 40 Years 1984-2024. Built On Service. Built-In Quality.
1.800.668.7214
Home
Products
Narrow Extruded Louvers
4" Extruded Louvers
5" and 6" Extruded Louvers
Acoustic Louvers
Formed Steel & SS Louvers
Penthouses
Vision Screens
Control Dampers
Industrial Dampers
Backdraft Dampers
Static Fire Dampers
Dynamic Fire Dampers
Gravity Ventilators
Weather Hoods
Insect Screen Systems
Submittals
IOM Instructions/Manuals
Louvers
Penthouses
Vision Screens
Control Dampers
Industrial Dampers
Backdraft Dampers
Static Fire Dampers
Dynamic Fire Dampers
Gravity Ventilators/Hoods
Insect Screen Systems
Projects
Centre Hospitalier de L'Universite de Montreal (CHUM), Montreal PQ
3100's with 60 Inch & 4 Inch Transitions
Mosaic Stadium, Regina Model 2420-OP Operable Louvers
Hopital Notre Dame Montreal Suspended Architectural Vision Screen, 2420 with Duranar Finish
Angrignon Subway Station Montreal 316 Stainless Steel Louver
University de Montreal, Pavillion Roger-Gaudry Copper Louver
National Arts Center, Ottawa Ontario, Model 2590 Louvers
Model Series 4800 Airfoil Blade Heavy-Duty Industrial Damper
The Merit, Ottawa, Ontario Vision Screen
U of T, 1 Spadina Cres. Toronto: Curved Frame Triangular Model 2210
Algonquin College, Ottawa, Ontario
Sheridan College Segmented Louver
Saskatoon Airport Control Tower
Mount Pleasant Road, Toronto Stormproof Louver
90 Elgin St. Ottawa, Custom Curtainwall Semi-Concealed Mullion, Top Floors
90 Elgin St. Ottawa, Custom Curtainwall Semi-Concealed Mullion, Lower Level
University Of Toronto
Archives of Ontario, York University, Toronto
MacDonald-Cartier Int'l Airport, Ottawa, Ontario
North York General Hospital, Toronto, Ontario
OEM Dog House Louvers Model 2215 with Hinged Access Doors
212 East, Chicago IL 2220 Stormproof Louver
30 King Street East Stormproof Louver
Clear Anodized Penthouse
Canada Brick, Burlington, Ontario Operable Louvers
Calgary Cancer Center
About Us
Contact Us
Francais
Rep Login
Home > Submittals & IOM's >
IOM Instructions/Manuals
IOM Instructions/Manuals
4000 Series section assembly
3005/3007 Assembly
3000 3001 Assembly
Jumper Assembly
3000 Control Damper Installation
Control Dampers Jackshaft Installation, Horizontal
Control Damper Jumper Installation Instructions
STS Sure-Turn-System HD Jackshaft
Louver Installation and Maintenance Instruction Manual
Multi Section Mitre Corner Penthouse Assembly Instructions
Barn Door IOM
Multi Section Penthouse Non Insulated Roof Assembly Instructions
Multi Section Mullion PH Assembly with Insulated Roof Instructions
5100S( -SS) 1-1/2 Hour Static Fire Damper Installation Instructions
5200S Thinline 1-1/2 Hour Static Fire Damper Installation Instructions
Periodic Testing of Dynamic Fire Dampers Caution
5100D 1-1/2 Hour Dynamic Fire Damper Installation Instructions
5300S 3 Hour Static Fire Damper Installation Instructions
Single-Side Retaining Angles Instructions
FIRE DAMPER INSTALLATION CAVITY WALL
Optional Sealing of Fire Dampers Instructions
Pull Ring Release for Horizontal Mount Fire Dampers
STS JACKSHAFT
MULTI SECTION IOM NOV 2023